What do engineers look like to an EPC at tender stage? They look like your deviations & clarifications (D&C) list. The EPC never meets your bid engineers. It reads their wording row by row. When three engineers word the same exception three different ways across your offers, the EPC sees three answers to one requirement. It opens a query round, and your offer can lose technical score and credibility at technical bid evaluation.
What do engineers look like to an EPC? Like your D&C list
To an EPC's technical evaluator, your bid desk is the D&C list and the compliance matrix behind it. The evaluator cannot see the judgment, the shop experience or the test history behind each position. It can only see how that position is written.
Trouble starts when the same deviation reads differently across several offers from one maker, or even across two lines of one offer. The EPC cannot tell which position is your real one. It does the only thing it can and asks. That means a query round, a slower technical bid evaluation, and an evaluator who reads your next tender with a little less trust.
Same exception, three wordings: a worked example
One requirement answered three ways shows the problem fastest. The example below is illustrative. It does not come from a real tender.
Requirement (illustrative): Project valve specification, section 6.4: stem seals to be type-tested for fugitive emissions to ISO 15848-1 at the tightness class stated on the customer data-sheet.
Wording A: "Fugitive emissions: to be discussed."
Wording B: "Exception taken to ISO 15848-1 requirement."
Wording C: "Spec section 6.4, customer data-sheet line 22. Status: deviates. Our standard stem seal is type-tested to ISO 15848-1 at a lower tightness class than the class specified. We offer our standard qualified seal and request acceptance, or a project-specific test at extra cost and time. Evidence: our valve data-sheet, rev C, p. 4, 'Stem seal type-tested to ISO 15848-1…'."
Here is how an EPC reads each one:
- Wording A raises a question. The evaluator does not know whether you comply, deviate or have not looked yet.
- Wording B raises a doubt. The evaluator knows you deviate but not how far, what you offer instead, or what the position rests on.
- Wording C can be evaluated. The evaluator can find the clause, see your position and alternative, and check the source.
Wordings A and B are not wrong engineering. The engineer may know exactly what the seal can do. They are unrecorded engineering: the knowledge never made it onto the page.
Why D&C wording drifts between bid engineers
D&C wording drifts because each engineer builds the list a different way, from a different starting point, under time pressure.
A valve, pump or actuator enquiry rarely arrives as one document. Requirements sit across project specs, the material requisition (MR), the inspection and test plan (ITP), customer data-sheets and the standards they call up, such as API 6D. Many are buried in running text and tables. Each engineer finds them in a different order and writes from memory of past tenders. Over a few years, each develops a personal style.
Limited engineering hours per tender push people to skim. Skimming produces short, hedged wording like "TBA" or "to be discussed." Most bid desks also have no shared rule for what an exception, a clarification and a missing document each look like on the page. Without that rule, consistency depends on who happened to work the tender.
Pulling every requirement into one register before anyone writes a word helps. See building a requirements register from the customer spec.
Internal to-dos on the customer copy: the quiet credibility leak
Internal notes left on a customer D&C list tell the EPC the offer is not finished. Lines such as "check with QA," "confirm with works" or "ask Dave re: coating" are normal working notes. On the customer copy they read as open risk.
The fix is structural, not a final tidy-up. Keep the customer D&C list and the internal action sheet as two separate documents from the start of the tender. The customer list carries only what the EPC needs to evaluate the offer and respond: exceptions, questions and documents you need. Everything your own team still has to do goes on the internal sheet.
What inconsistent D&C lists cost at technical bid evaluation
Inconsistent D&C lists cost bid desk hours, technical score and credibility, and sometimes margin after the order.
- Query rounds. Every vague or conflicting row invites a query. Answering them uses bid desk hours on tenders you are already short of time for.
- Lower technical score. Vague or conflicting exceptions can be marked down or treated as non-compliant at technical bid evaluation.
- Lost credibility. An EPC that sees several offers from you learns whether your D&C list can be taken at face value.
- Post-order cost. A requirement left unanswered or loosely worded at bid stage can come back after the order as a re-test, a non-conformance or a back-charge, and the margin on the job goes with it.
The last point is not unique to equipment bids. According to a recent piece by basewise.ai, requirements that look complete but are ambiguously written or unverifiable lead to costly late fixes. A loosely worded exception is the supplier-side version of the same problem.
A D&C list with three kinds of rows: exceptions, clarifications and documents to request
A clean D&C list has three kinds of rows, and each one asks the EPC for something different.
| Row type | What it says | What the EPC must do |
|---|---|---|
| Exception | Your equipment deviates from the requirement, and here is your alternative | Accept or reject the alternative |
| Clarification | A question that must be answered before the requirement can be confirmed | Answer the question |
| Document to request | The requirement depends on a document the package did not include | Send the document |
Documents to request deserve special care. A requirement may depend on an ITP that was never sent, or a data-sheet referenced but not attached. Raise these before the offer is priced, not after. For what the ITP usually governs, see ITP hold and witness points.
Mixing the three types in one undifferentiated list is what drives repeated queries. The EPC has to work out, row by row, whether you are declaring an exception, asking a question or waiting on paperwork, and it will ask when it cannot tell.
How to word a deviation the same way every time
A shared row pattern is the simplest way to get the same wording from every engineer on the bid desk. Adopt these five parts as a team standard:
- The customer requirement, quoted or closely paraphrased.
- Where it sits in the customer's documents: spec section, MR line item, ITP step or data-sheet line.
- The status: complies, deviates, needs clarification, or not addressed.
- Your position: what you offer, and for a deviation, your alternative.
- The evidence: the quote and page from your own data-sheet or test procedure.
Then apply three rules:
- No open-ended phrases on the customer copy. "TBA" and "to be discussed" become either a clarification question to the EPC or a to-do on the internal sheet.
- One requirement, one row, one position. Never answer the same clause differently in two places in the offer.
- Read the D&C list against the compliance matrix. A "deviates" in one must never be a "complies" in the other. For how that matrix should be built, see what a compliance matrix is for engineering tenders.
Why the evidence behind each row is what makes wording consistent
Two engineers can only word a position the same way when they are reading the same source. A style guide alone will not fix drift. Tying each row to a quote and page from your own documents will.
Evidence also changes who has to remember what. A reviewer signing off, and later an EPC querying a row, can check the source rather than the engineer's memory. That makes sign-off faster and answers to queries easier to defend.
Add one check before a row goes into the list: confirm that the quoted text actually appears where the row says it does. A row whose quote cannot be found goes back to review, not into the offer. For the supplier-side version of this check, see checking your data-sheet against the specification.
Where software fits, and where it doesn't
Software can take on the reading and the first draft. It should not take on the decision. OdysseyGPT is one way to do this. It reads the customer's spec package and your own data-sheets and test procedures clause by clause, in PDF, Word, Excel and CSV. Each requirement is marked complies, deviates, needs a clarification, or not addressed, with a quote from your document and its page, sheet or cell.
The output is an editable compliance matrix and D&C list. The D&C list separates the exceptions you take, the questions you need answered and the documents you still need. Internal to-dos go on a separate sheet, kept off the customer list. If the package lacks a document a requirement needs, such as an ITP that was never sent, the requirement is flagged as a document to request. If a quote cannot be verified against the source, the finding goes to review instead of into the matrix.
The limits matter as much. OdysseyGPT does not read drawings such as general arrangements or P&IDs. It does not replace bid engineers. A named engineer reviews and signs off every row before anything goes back to the EPC, because your engineers own what goes out. More on how this applies to compliance matrix and deviation list for valve, pump and actuator tenders.
Where to start this week
You can test how consistent your D&C wording is with documents you already have.
- Pull your last three tender D&C lists for one EPC. Find a requirement answered in more than one way.
- Agree the three row types and the five-part row pattern as a bid desk standard.
- On the next tender, split the internal action sheet from the customer copy before any wording is drafted.
Read next: Engineering Compliance Matrix vs Proposal Compliance Matrix explains how to build the matrix your D&C list should be read against.
Frequently asked questions
What is a D&C list in a tender?
A deviations & clarifications (D&C) list is the part of a tender offer that tells the EPC where your equipment deviates from its specification, what questions you need answered, and which documents you still need. It sits alongside the compliance matrix and should never contradict it.
Why does an EPC send query rounds on our D&C list?
An EPC queries a D&C list when a row is vague, has no reference, or conflicts with another answer to the same requirement. Each row it cannot evaluate as written becomes a question back to your bid desk.
Should internal notes ever appear on the customer D&C list?
No. Internal to-dos such as 'check with QA' tell the EPC the offer is unfinished, so keep them on a separate internal sheet from the start of the tender.
How do we get every bid engineer to word deviations the same way?
Agree one row pattern as a bid desk standard: the requirement, where it sits in the customer's documents, the status, your position, and the quote and page from your own data-sheet or test procedure. Tying each row to the same source is what makes wording converge.
Can software write our D&C list for us?
Software such as OdysseyGPT can read the spec package and your data-sheets and draft an editable compliance matrix and D&C list with quoted evidence. A named engineer still reviews and signs off every row, and it does not read drawings or P&IDs.